Custom Painting By BobEst. 1995 · Fort Pierce

Port St. Lucie · St. Lucie County

Port St. Lucie exteriors that hold through the heat.

Port St. Lucie's stucco inventory moves with Florida heat. Hairline cracking and prior thin coats are common — painting over them without repair is how a two-year failure starts.

Bob Bach takes full exteriors and interiors on a limited calendar. If your project needs real prep, it fits. If it needs a one-day patch crew, it does not.

What the local substrate usually needs

Stucco and block dominate. Caulk joints at windows and transitions get attention before finish coats. Soft trim is called out before color goes on.

Recent exterior work on the Treasure Coast

Same two-story home after exterior repaint in slate blue with cream trim
Two-story stucco home before color change, sage body with dark trim
BeforeAfter
After — slate blue body, cream trim
Freshly painted white and gray stucco ranch with arched entry on the Treasure Coast

Whole-home exterior finish · white body, gray trim accents

Two-story stucco home before color change, sage body with dark trim

Before — sage stucco body, dark trim

Same two-story home after exterior repaint in slate blue with cream trim

After — slate blue body, cream trim

Exterior color change in progress on a yellow bungalow with ladder and paint on site

Color change in progress — yellow to light gray

Questions from Port St. Lucie homeowners

  • Many PSL exteriors are stucco and block with hairline cracking from heat movement. Those cracks get addressed before finish coats — painting over them is how a two-year failure starts.
Start a project

Tell us about the project.

Bob reviews every inquiry personally. The more you can tell us about the property and the timeline, the faster we can tell you whether it's a fit.

Monday–Friday · Fort Pierce, Florida

Book the walkthrough

Calendar embed is not configured yet. Call Bob directly to set a time.

Call (772) 979-1051
Step 1 of 333%

Bob responds to every inquiry within one business day. Because the schedule is limited, full-home and cabinet projects are prioritized.